Posted - By On - Masumi Suga, Copyright 2013 Bloomberg.)
Mitsui Engineering & Shipbuilding Co., the heavy machinery maker
whose merger talks with Kawasaki Heavy Industries Ltd. fell apart
earlier this year, has teamed with other shipbuilders in Japan to bid
for contracts to build natural gas tankers to service shale-gas projects
in the U.S.
The competitiveness of Japanese shipbuilders “has moved close to the
Koreans in terms of the currency,” President Takao Tanaka said in an
interview in Tokyo last week. “It’s easier for us to compete in the LNG
tanker market” compared with the cargo market, he said.
The yen’s 14 percent decline since Prime Minister Shinzo Abe took
office in December is reviving the competitiveness of Japanese
shipbuilders. The timing is advantageous because Japan, the world’s
largest buyer of liquefied natural gas, is in the midst of searching for
cheaper energy sources after the Fukushima disaster in March 2011.
More than 700 liquefied natural gas tankers will be needed to satisfy
the global market by 2030, almost twice the current fleet of LNG ships
in operations, Tanaka said, citing industry data. Mitsui Engineering has
the capacity to build as many as three LNG tankers a year, he said,
without naming potential partners in Japan.
One possibility is for Mitsui Engineering to team with Kawasaki Heavy
to build LNG ships, Tanaka said. Kobe-based Kawasaki Heavy fired its
president and scrapped merger talks with Mitsui in June.
Japan’s three other builders of LNG tankers include Mitsubishi Heavy
Industries Ltd., closely held Imabari Shipbuilding Co. and Japan Marine
United Corp., the venture formed in January by the merger of the
shipbuilding units of IHI Corp. and JFE Holdings Inc.
Contract Talks
Japanese shipbuilders, including Mitsui Engineering, are in
discussions with shipowners for contracts to supply LNG carriers, Tanaka
said, adding that each contract would be for more than 10 vessels for
delivery after 2017.
Mitsui Engineering, the most reliant of Japan’s major heavy machinery
makers on shipbuilding for sales, also plans to forge two separate
ventures in Southeast Asia with local partners to produce container
cranes and equipment for chemical plants as part of its push to move to
destinations where demand is expanding and costs are lower, he said.
The company reported its first annual loss in 11 years in the
financial year ended March 31 because of a 24 billion yen ($241 million)
impairment charge. It forecasts a profit of 7 billion yen this year.
“Burnable Ice”
Mitsui Engineering intends to be “one of the main players” in a
project backed by Japan to extract fuel from deposits of methane
hydrate, known as “burnable ice,” from under the seabed.
The company is developing a gas hydrate carrier, storage and
gasification facility. It also owns Modec Inc., the world’s
second-biggest builder of floating production, storage and offloading
platforms.
In March, Japan conducted the world’s first tests to extract fuel
from methane hydrate deposits. The deposits may be large enough to
supply the nation’s natural gas needs for about 100 years, according to
Japan Oil, Gas & Metals National Corp.
“No one predicted that U.S shale gas would be realized,” Tanaka said. “Technology will advance when needs are quite high.”
Post to be found at:
http://gcaptain.com/mitsui-engineering-lng-shipbuilding/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+Gcaptain+%28gCaptain.com%29
No comments:
Post a Comment